EnviRoad Base™ (CBSMS-1S)

Photos

Completed shoulder stabilization – Hwy. 21 in San Marcos, TX
Achieved density of over 100%.
Stabilizing base material with CMI.
Placing base material on stabilized subsoil.
Long term solution for new housing development.
No specialized equipment needed to stablize the soil.